Gateway 2 fire strategies: what the regulator expects

Gateway 2 is the point where the Building Safety Regulator decides whether building work on a higher-risk building in England can start. The fire strategy is at the centre of that application. It has to show, in enough detail for the regulator to approve it, how the building will meet the fire safety requirements of the Building Regulations. Applications that rely on outline designs, generic statements or details "to follow" are the most common reason for delay.

Design team reviewing building plans on site

Key takeaways

  • Gateway 2 applies to higher-risk buildings in England, not Wales
  • Work cannot start until the Building Safety Regulator approves the application
  • The fire strategy must be detailed and specific to the building, not an outline
  • Late or incomplete information is the main cause of delay
  • Changes after approval need to go through change control

Which buildings go through Gateway 2

The higher-risk building regime under the Building Safety Act 2022 applies in England to buildings at least 18 metres high or with at least seven storeys that contain at least two residential units, and to care homes and hospitals that meet the same height threshold during design and construction. For these buildings, building control is carried out by the Building Safety Regulator rather than a local authority or registered building control approver.

There are three gateways. Gateway 1 is a fire statement at planning stage. Gateway 2 is the building control approval application before work starts. Gateway 3 is the completion certificate application before the building can be occupied.

What the regulator is looking for

At Gateway 2 the regulator needs enough information to be satisfied that the building, as designed, will comply with the Building Regulations. For fire safety, that means a strategy written for this building, with the reasoning behind each decision visible. It should not read as a template with the project name changed.

A Gateway 2 fire strategy typically needs to set out clearly:

  • The guidance followed, such as Approved Document B or BS 9991, and every departure from it, with the engineering justification
  • The evacuation strategy and how the design supports it, including any evacuation lift
  • Means of escape, including stairs, travel distances and protected lobbies
  • Compartmentation, fire stopping and cavity barriers, with the fire resistance periods
  • External walls, including materials and how they meet the restrictions on combustibility
  • Structural fire resistance
  • Firefighting access and facilities: firefighting shafts, lifts, dry or wet risers and smoke control
  • Active systems: detection, alarm, sprinklers and smoke ventilation, and how they interact
  • Management assumptions the building relies on once occupied

New residential buildings of 18 metres or more are now expected to have a second staircase under Approved Document B, and the strategy should show how that has been addressed.

Why applications are sent back

From what design teams report, the most common problems are not exotic engineering questions but missing or inconsistent information:

  • Key design decisions left "to be confirmed by the contractor"
  • Drawings that do not match the fire strategy text
  • Departures from guidance with no clear justification
  • Product choices, especially for external walls and fire stopping, not identified
  • Fire strategy written late, after the layout has been fixed around the wrong assumptions

Each round of questions adds weeks to a programme. Getting the strategy complete and consistent before submission is the single most effective way to protect the start date.

After approval: change control

Gateway 2 approval is for the design as submitted. If the design changes during construction, for example a different cladding product, a revised layout or a substituted fire-stopping system, the change has to be managed through the change control process, and some changes need the regulator's approval before the work is done. The fire strategy should be kept current as part of the golden thread of building information that carries through to Gateway 3 and occupation.

What about Wales?

In Wales

The Gateway process and the Building Safety Regulator's higher-risk building regime do not apply. Building control follows the Welsh regulations and Approved Document B (Wales), and new and converted homes generally need sprinklers. The Welsh Government is reforming building safety law, and we advise on the current Welsh position for each project.

How we help

We write fire strategies in-house for higher-risk and other buildings, from RIBA Stage 2 through to handover. Managing Director Paul Chamberlain spent more than 30 years in Fire and Rescue, so we write with the fire service's view of the building in mind, and we respond to regulator and fire service comments directly. Send us your drawings for a fixed-price quote.

FAQs

Gateway 2 questions

Does Gateway 2 apply in Wales?

No. The Gateway process and the Building Safety Regulator's role in building control for higher-risk buildings apply in England. Welsh projects go through Welsh building control against Approved Document B (Wales).

Can work start before Gateway 2 approval?

No. Building work on a higher-risk building in England cannot start until the Building Safety Regulator has approved the building control application.

What is the difference between the Gateway 1 fire statement and the Gateway 2 fire strategy?

The Gateway 1 fire statement is submitted with the planning application and deals with fire safety matters that affect land use and layout. The Gateway 2 fire strategy is the detailed design submitted for building control approval before work starts.

When should we appoint a fire engineer for a higher-risk building?

At concept design, RIBA Stage 2 at the latest. Stair numbers, firefighting shafts and external wall choices shape the whole scheme and the Gateway 1 fire statement, so they need fire input before the layout is fixed.

Get a clear, fixed-scope quote

Tell us about your building and what you need. We will come back with a written proposal: scope, timescale and price, with no obligation.

Or call 0330 133 4591
Call us